EQUIPMENT
BULDING MECHANICAL & ELECTRICAL SYSTEMS
The apartment building's mechanical systems were installed in compliance with the "near-zero energy"
energy standards. The required 25% renewable energy share is ensured by a pre-heating heat pump
for domestic hot water production and the power generation of a small solar power plant system installed on the roof. The electricity generated by the latter is used for the lifts of the building unit, the
lighting of the common areas and the main mechanical consumers.
RELATED TO THE APARTMENTS
piped drinking water supply, which includes hot water production and the installation of a
circulation system
urban (domestic) waste water disposal,
heating system: gas-fired central heating boiler with heat metering for each apartment, white
steel plate radiators in the apartments, thermostatic control valves on radiators
installation of a cooling system with ductwork per dwelling for split air conditioners,
mechanical extraction of bathrooms, toilets, mechanical connection to kitchen extractor hoods
installation of electrical systems for lighting, sockets and other high current equipment
installation of cable television and intercom systems,
the installation in each dwelling of a receiving housing for the shutters in front of the doors and
the installation of a control system with a protective tube for the mechanical movement of the
shutters.
The basic wiring systems required for the operation of the split air-conditioning systems are
installed in each apartment.
All consumption in the apartments is provided with individual meters.
RELATED TO OTHER AREAS OF THE BUILDING
a rainwater and leachate drainage network with the necessary buffer tanks,
the construction of basic systems for the irrigation of green areas,
building automation systems controlling the main mechanical installations,
fire alarm and emergency fire control systems,
building lightning protection and internal earthing systems.
The main mechanical systems are installed with accurate sizing to meet acoustic and environmental
standards, with separate main building services main meters.
ELEVATOR
We install one barrier-free elevator with a maximum payload of 630 kg per stairwell.